Water-cooled box type industrial chiller installation diagram and description

Water-cooled box type industrial chiller installation diagram and description

Water-cooled box type industrial chiller installation diagram and description

Water-cooled box type industrial chiller installation diagram

First, the installation

    Before installing the water-cooled chiller, please select a stable foundation, open the surrounding area and avoid corrosion and pollution. Select the matching cooling tower according to the cooling capacity of the chiller and the piping of the chiller. Please install according to the size of the fuselage. The size of the cooling water pipe is reduced in a hurry, which will cause high voltage overload, affect the system effect and increase power consumption.

Note: Please follow the relevant regulations for power supply, load and grounding.

Second, the method of operation

For the first time, you must first check if the following items are correct:

1, power, voltage and number of phases model meets specifications, the control nameplate. (Note: 3HP ice machine power is more than four-wire three-phase voltage 380-415, 50HZ power phase line R .S.T whole are neutral line (zero line) N, the ground conductor of E.

2, and cooling cycles Plumbing Plumbing ice is on the line, and keep the valve open (refer to FIG installation).

3, the first after the ice before they start the pump to fill the tank.

4 , please pay attention to whether the pump running direction is reversed (such as the pump is three-phase), if reverse, you must change any two of the power phase line, press the switch board.

Third, with the installation of water-cooled industrial chiller

Steel Cord

Steel Cord,Tyre Steel Cord,Tire Steel Cord

Qingdao Rongyan Cosmetic Appliance Co.,Ltd , http://www.cosmeticpuff.com